- The concrete mix shall conform to all requirements as specified by the contract document.
- The tools required for installation are typical of those used by concrete finishers.
- Do not remove the galvanized steel angle, inserts or bolts before placement. The panel shall
be placed in concrete with all the hardware attached.
- Follow all safety requirements that include but not limited to, State, Federal Industry safety
standards.
- After the concrete is poured, the contractor shall establish finished grade using mason line or
other appropriate methods. The polymer concrete panel shall be placed on top of the concrete
and tamped in place using installer’s weight or concrete vibrator to facilitate placement in a
low slump concrete. Final panel elevation shall be verified.
- Make sure that you have the proper slope as specified in the contract document.
- Low slump concrete may require 25 to 50 pounds weights to weigh down panels after
placement in concrete.
- Steel edging trowel with a minimum of 1/8” radius shall be used to edge the finished
concrete around the panel. 1/2” deep groove is required.
- Once concrete is hardened, remove weights and panel protective cover.
|
|
|
|
|
|